Seattle describes earthquakes as its most serious hazard. A condominium board cannot make a building earthquake-proof or replace engineers and emergency officials, but it can control whether structural records are organized, hazards are evaluated, emergency roles are assigned, building systems are understood, residents receive accurate guidance, and post-event decisions are documented.

Separate three workstreams from the start: structural risk reduction before an event, life-safety and continuity planning, and response after shaking. Each requires different authority and professionals. The board governs association decisions and funding; licensed engineers evaluate structural conditions; qualified contractors perform permitted work; insurers interpret coverage; counsel advises legal duties; and public agencies direct emergency response and official building status.

Create a building facts file. Record original construction year, structural system, number of stories and units, additions, conversions, major alterations, permitted seismic work, structural drawings, geotechnical reports, facade and parapet work, fire and elevator systems, utilities, emergency power, water storage, access routes, insurance, reserve-study references, and prior earthquake or settlement findings. Mark every assumption and missing source rather than filling gaps from memory.

Check whether the building may contain unreinforced masonry. Seattle SDCI describes a typical URM as a brick building, generally built before 1945, with one or more load-bearing unreinforced masonry walls. Review the City's current URM database and project documents, but do not treat absence from an inventory as an engineering conclusion. SDCI states that a building later found to contain qualifying URM walls can still be classified as URM.

Use current City guidance for retrofit status. When this checklist was reviewed on October 28, 2026, Seattle's current URM FAQ said the City was not yet broadly mandating complete URM retrofits, while identifying current requirements such as retrofitting URM parapets when other permitted construction work is done in the building and seismic retrofit requirements tied to major renovation, vacant-building reoccupancy, or change of use or occupancy. Requirements, program design, funding, and code interpretations can change. Verify the live SDCI pages and use a licensed structural engineer and permit professionals for the actual property.

Commission qualified evaluation based on the building, not a generic checklist. Ask the engineer to define the available records, site visit, structural systems reviewed, hazards observed, limitations, recommended further investigation, conceptual risk-reduction options, code and permit questions, phasing, temporary measures, rough cost ranges, and priorities. Board members and managers should not label a building safe, unsafe, retrofitted, or compliant based only on age, visible brick, an old reserve study, or a database entry.

Inventory nonstructural hazards. Heavy equipment, water heaters, storage racks, suspended fixtures, cabinets, glazing, facade elements, rooftop equipment, piping, fire-suppression components, generators, batteries, fuel, and unsecured contents can injure people or block exits. Assign qualified professionals to identify and correct risks. Record the component, location, owner, recommendation, permit question, budget, completion evidence, and inspection or maintenance interval.

Map utilities and building controls. Seattle OEM tells residents to understand utility shutoffs, and City guidance warns that phone systems and the 911 center can be overwhelmed and that it may be several days before power or water is restored. For a condominium, identify domestic water, fire water, natural gas, electricity, emergency power, elevators, access control, garage gates, pumps, communications, and critical mechanical systems. Document who is authorized and trained to act, what should never be operated by volunteers, and how decisions change when alarms, power, cellular service, or internet fail.

Create a floor- and role-based emergency structure. Seattle's SNAP guidance for condominiums and apartment buildings suggests organizing by floor, identifying residents who may need assistance, mapping key building locations, coordinating shared supplies, and selecting meeting places. Define incident lead, floor or area contacts, communications lead, facilities contact, resident-accounting process, first-aid coordination, vendor liaison, board liaison, and backups. Participation should be voluntary, privacy-conscious, accessible, and consistent with counsel and emergency-professional guidance.

Plan for residents who may need additional assistance without building a public medical list. Invite residents to share only the help and communication preferences they choose, restrict access, define retention, and confirm the plan periodically. Consider mobility, hearing, vision, language, cognitive, medication, service-animal, power-dependent-device, caregiver, and evacuation needs. Do not promise rescue or disclose health information beyond the lawful operational need.

Inventory common emergency supplies and their limits. Seattle materials tell households to prepare for several days without restored power or water; check the Seattle Office of Emergency Management's current preparedness materials for how many days of supplies it recommends. The association should decide what common supplies it will maintain, where they are stored, who can access them, replacement dates, generator or battery limitations, and what remains each household's responsibility. Avoid creating reliance on equipment the building cannot safely operate or replenish.

Make communications redundant. Use AlertSeattle as an official public-alert source and maintain association channels such as text, email, portal, phone tree, lobby posting, radio, and in-person floor contacts. Prepare short templates for shaking, evacuation, sheltering, water or power loss, suspected gas leak, fire-watch instruction, building access restriction, inspection pending, vendor arrival, and all-clear authority. State what is known, the source, time, action, next update, and emergency contact; do not speculate about structural safety.

Prearrange post-earthquake building assessment. Seattle SNAP guidance notes that City inspectors may be heavily occupied after a major event and suggests that building managers can work with a private engineer for an advisory assessment while waiting for an official tag. Establish the engineer or qualified provider, scope, activation contact, access, authorization, fees, backup, reporting format, and relationship between advisory findings and official City action. Counsel, the engineer, insurer, and SDCI should guide use of tags and occupancy decisions.

Write a no-reentry and controlled-access procedure. Seattle tells people not to enter damaged buildings and to move away from them. The association plan should identify who can close common entrances, preserve responder access, account for residents, communicate restrictions, retrieve essential records remotely, control keys and credentials, meet inspectors, support people displaced, and record every decision. Directors and managers should not overrule firefighters, police, SDCI, or other authorized officials.

Coordinate fire and life-safety impairment. Shaking and power loss can affect alarms, sprinklers, pumps, elevators, emergency lighting, access control, and communications. Seattle's condominium preparedness guidance notes that a fire watch may be needed if fire alarm or suppression systems are out. Use Seattle Fire Department requirements and qualified vendors for any fire-watch or impairment procedure. Do not invent a watch from a general checklist or assign untrained residents without official direction.

Connect earthquake readiness to insurance without promising coverage. Ask the broker to explain property, earthquake, flood, equipment-breakdown, business-income or extra-expense, ordinance-or-law, loss-assessment, directors and officers, crime, deductibles, exclusions, valuation, notice, mitigation, and claim documentation. Record only broker-confirmed information. Owners should be encouraged to review their own unit, contents, loss-of-use, liability, and earthquake coverage with their advisers.

Connect engineering findings to reserves and capital planning. Give the reserve professional the structural evaluation, facade and parapet scope, equipment anchorage, utility and generator work, fire and elevator dependencies, design and permit costs, temporary protection, phasing, escalation, and useful-life information. Ask how each item belongs in the reserve analysis and what may require separate operating funds, special assessment, loan, grant, insurance, or other financing. A reserve study is not a structural evaluation or emergency plan.

Control records and remote access. Keep current drawings, reports, permits, contacts, insurance, reserve data, resident communication templates, vendor agreements, shutoff maps, equipment inventories, meeting decisions, credentials, and response logs in a restricted repository that authorized people can reach when the office or building is inaccessible. Maintain an offline contact and action packet without exposing bank, resident, medical, access, or security-sensitive information.

Exercise the plan. Run a tabletop in which shaking damages water service, disables elevators and internet, creates a fire-system impairment, and leaves the building awaiting inspection. Ask who acts in the first 10 minutes, hour, day, and week; who communicates; what authority exists; how residents are accounted for; how vendors enter; how safety restrictions are preserved; and what evidence the board retains. Record gaps, owners, due dates, and retest dates.

Make the program portable. Before changing managers, engineers, emergency vendors, insurers, board officers, access systems, or software, transfer the facts file, URM and seismic records, contacts, utility maps, resident-support process, supplies, templates, contracts, insurance, reserve decisions, credentials, exercise results, and open projects. Test that the successor can locate the earthquake plan, activate the engineer, communicate without internet, and find the authorized shutoff information.

This checklist is general association-management education, not legal, structural, geotechnical, architectural, engineering, fire-code, emergency-response, disability, privacy, medical, utility, insurance, reserve, tax, financial, or safety advice. City programs, code triggers, inventories, contacts, permits, funding, and official response procedures change. Verify current official sources and use qualified Washington professionals for the actual building and facts.